Last Updated: November 5, 2026

A steel frame A-frame home uses a light gauge steel frame instead of timber for the steep triangular roof-walls, which means the frame cannot be eaten by termites, will not rot, warp or burn, and is engineered for the snow, wind and bushfire loads of your exact site. The cost difference sits in the frame, not the whole house: cladding, roofing, windows, lining and fit-out are the same whichever frame you choose. This guide sets out how steel and timber compare on durability, which Australian standards apply, how to look after a steel frame, and the published kit prices.

Steel vs timber for an A-frame: the durability comparison

FactorSteel frameTimber frameSource
TermitesSteel primary building elements are not subject to termite attack, so no termite management system is needed for the frameTermite management required unless the timber is naturally resistant or treated to AS 3660NCC Housing Provisions Part 3.4
Moisture and rotDoes not rot or change shape with moisture; the metallic coating protects against corrosionCan shrink, swell or decay if it stays wetYour Home
BushfireNon-combustible; the NCC references the NASH Standard for steel framing in bushfire areasCombustible; relies on the cladding and linings required by AS 3959AS 3959; NCC Volume Two H7D4
Design standardNASH Standard or AS/NZS 4600AS 1684NASH
Energy efficiencySteel conducts heat, so a thermal break is required on metal-framed walls and roofsA natural insulator and a poor thermal bridgeABCB thermal bridging guide
StraightnessRoll-formed to size, so walls and ridge lines go up straightQuality varies by batch and moisture contentYour Home

For the full comparison across all house styles, read steel frame vs timber frame kit homes on Kit Home Floor Plans.

Why the A-frame shape suits steel

In an A-frame the rafters are also the walls. They carry the roof, any snow on it and the wind on both faces, and they run long and steep. A steel frame is engineered as a set: the rafters, collar ties, floor and any loft are designed together for the loads on your site, and the members are cut and punched in the factory so they fit on site without trimming. That is why each A-frame kit comes with engineering for its location rather than a one-size frame.

Engineering for snow, wind and bushfire

Site conditionStandard usedWhat it changes in the frame
Snow (alpine shires)AS/NZS 1170.3 Snow and ice actionsRafter size and spacing for the snow load at your altitude
WindAS 4055 wind classes for housing (N1 to N6, C1 to C4) or AS/NZS 1170.2Bracing, tie-downs and connections
BushfireAS 3959 Bushfire Attack Level (BAL), plus the NASH bushfire standard for steel framingThe frame is non-combustible; the cladding, roofing, windows and vents must meet your BAL
Coastal exposureCorrosivity of the site’s atmosphere (AS 4312)Whether extra protection is needed for framing near the sea or in exposed positions

A BAL assessment for your block decides the bushfire construction level. Read our A-frame homes for bushfire zones guide, and the alpine A-frame cabin guide for snow country.

Looking for A-Frame Floor Plans?

Browse real A-frame kit home designs with pricing on Kit Home Floor Plans.

View A-Frame Designs

Looking after a steel frame

  • Keep the frame inside a sealed envelope. Frames inside the cladding, roofing and sarking stay dry, which is the condition the coating is designed for.
  • Fix leaks early. Roof or plumbing leaks that keep the frame wet are the main risk for any frame material.
  • Keep dissimilar metals apart. Use the fixings and isolation the engineering specifies, for example where copper pipes pass through steel.
  • Check exposed steel. Any steel left exposed outside, such as a deck frame or carport, needs the coating or paint system the engineer specifies for that exposure.
  • Keep the subfloor ventilated and the ground drained away from the building.

BRIbuild frames are made from TRUECORE steel by BlueScope, a metallic-coated steel made to AS 1397.

What a steel frame A-frame kit costs

These are the A-frame kit prices published on this site. Every other design and size is quoted for your site, including engineering for your snow, wind and BAL.

DesignSizeBedroomsKit price
The Jamieson25 m² + optional loft1From $35,000
The Marysville60 m², two levels1From $65,000
The Harcourt80 m²2From $79,500
The Dinner Plain180 m² with mezzanine3From $145,000

What the kit includes

Included in the kitNot included (supplied separately)
Steel subfloor, wall frames, roof trusses and engineeringWindows, doors, cladding, roofing, insulation and flooring

Delivery is quoted. We assist you with drafting, council planning and DA, and building permits. Not sure why something is not in the kit? Ask us why. For the full budget, see A-frame kit home cost in Australia and A-frame vs traditional house cost.

Building code by state

VIC and TAS use NCC 2025 from 1 May 2026. WA and the ACT adopted NCC 2025 on 1 May 2026 but still accept NCC 2022 until 1 May 2027. NSW and QLD stay on NCC 2022 until 1 May 2027. SA is on NCC 2022 Amendment 2 until 30 April 2027, then NCC 2025. The NT has not adopted NCC 2025. Check the ABCB adoption table for your project.

Frequently asked questions

How long does a steel frame A-frame home last?

A steel frame kept dry inside the building envelope is designed to last the life of the house. Its life depends on the site exposure and on keeping leaks out, so ask for the engineering to state the exposure the frame is designed for.

Is a steel frame better than timber in termite areas?

For the frame itself, yes: the NCC treats steel primary building elements as not subject to termite attack, so the frame needs no termite management system. Timber elements elsewhere in the house, such as flooring or joinery, may still need protection.

Can I build a steel frame A-frame in a bushfire zone?

Yes. The steel frame is non-combustible, and the cladding, roofing, windows, doors and vents are chosen to meet your Bushfire Attack Level under AS 3959. Get a BAL assessment for your block first.

Can I assemble a steel frame A-frame kit myself?

Many owner builders do. The frames arrive cut, punched and labelled with the engineering drawings. You need owner-builder approval above your state’s threshold, and licensed trades for electrical and plumbing work.

Do steel frames need painting?

Not inside the house: the metallic coating protects frames inside the building envelope. Steel left exposed outside needs the coating or paint system the engineer specifies.

Does a steel frame cost more than timber?

It depends on the design and the quotes you compare. Compare kits line by line: what each includes, the engineering for your site, and delivery. Our published A-frame kit prices start from $35,000.

Ask about a steel frame A-frame for your site

Tell us your location, BAL if known, and the design you like, and we will quote the kit and its engineering. Call 1300 866 131 or use the form.

Thanks! We'll be in touch soon.

Ready to Build Your A-Frame?

Contact us today to discuss your A-Frame kit home project. We'll help you every step of the way.

Get a Quote 1300 866 131