An A-frame kit home in Australia starts from $35,000 for the frame kit of a small 25 m² cabin (The Jamieson), and our published A-frame kits run up to $145,000 for a 180 m² three-bedroom home (The Dinner Plain). Those prices cover the structure only. Your total build cost then depends on your site, foundations, roofing, cladding, windows, services, fit-out and who does the labour, so the reliable way to a total is the kit price plus local quotes for everything else.
A-Frame Kit Home Prices by Design (2026)
These are the A-frame kits with a published price on Kit Home Floor Plans (checked 27 October 2026). Each price is for the steel frame kit of that design, plus GST, as published there.
| Design | Size | Bedrooms | Kit price |
|---|---|---|---|
| The Jamieson | 25 m² + optional loft | 1 | From $35,000 |
| The Marysville | 60 m², two levels | 1 | From $65,000 |
| The Harcourt | 80 m² | 2 | From $79,500 |
| The Bright | 140 m² | 3 | From $105,000 |
| The Dinner Plain | 180 m² with mezzanine | 3 | From $145,000 |
Other A-frame designs, such as the Licola (55 m²), Maryanne (95 m²) and Omeo (120 m²), are priced on request. Final pricing depends on engineering for your site (wind, snow and bushfire), delivery to your location and any changes to the plan.
Get Exact Pricing for Your Project
See every A-frame floor plan with its size, bedrooms and price where published.
What’s Included in an A-Frame Kit Price
Our kits are structure only. The kit price covers the parts that are engineered and made for your design:
Included in the kit
- Steel frame system: wall frames and roof trusses made from BlueScope TRUECORE® steel, which carries BlueScope’s 50-year TRUECORE steel warranty (see BlueScope’s terms)
- Engineering: the frame is engineered for your site’s wind classification and, where needed, snow load and bushfire attack level (BAL)
- Engineering certification for your building permit application
We assist you with drafting, council planning and DA, and building permits. Delivery is quoted with your kit, anywhere in Australia.
Not included (quoted separately)
- Site preparation and earthworks
- Concrete slab, piers or steel subfloor footings
- Roofing, external cladding, windows and external doors
- Plumbing and electrical (licensed trades)
- Insulation and internal wall linings
- Kitchen, bathroom and laundry fit-out
- Flooring and painting
- Labour to erect the frame and finish the home
- Permit, certifier and council fees
How to Work Out the Total Cost of an A-Frame Home
There is no reliable flat rate per square metre for a finished A-frame home: two homes on the same plan can differ widely because of the site and the finishes. Build your budget in this order:
| Step | What to price | Who gives you the number |
|---|---|---|
| 1. Kit | The frame kit for your chosen design, engineered for your site | The plan price, or our quote on your plan |
| 2. Delivery | Transport to your site (access, distance, truck size) | Quoted with your kit |
| 3. Site and footings | Earthworks, soil test, slab or piers, drainage | Local excavator and concreter, after a soil report |
| 4. Lock-up | Roofing, cladding, windows, external doors | Local roofer and suppliers |
| 5. Services | Plumbing, electrical, connections, septic or tanks if off grid | Licensed plumber and electrician |
| 6. Fit-out | Insulation, linings, kitchen, bathroom, flooring, paint | Local trades or your own labour |
| 7. Approvals | Planning (if required), building permit, certifier and inspections | Your council and building surveyor |
| 8. Contingency | An allowance for the unexpected (rock, access, design changes) | You: set it before you start |
A-frames are steep-roofed, so the roof is also most of the wall. That changes the budget compared with a box-shaped home: more roofing and less wall cladding, and loft or mezzanine floors that add floor area without adding footprint.
What Affects the Price of an A-Frame Kit Home?
Site wind classification
Every frame is engineered to the site’s wind classification under AS 4055 (N1 to N6 non-cyclonic, C1 to C4 cyclonic). Higher classes, common on exposed coastal and northern Australian sites, need heavier framing and more bracing.
Bushfire attack level (BAL)
Homes in bushfire-prone areas are built to AS 3959, which the National Construction Code references. The higher the BAL (12.5, 19, 29, 40, FZ), the stricter the requirements for cladding, windows, decks and gaps. A steel frame is non-combustible, but the rest of the envelope still has to meet the BAL.
Snow load and alpine sites
Alpine and high-country sites can need the roof engineered for snow load. A-frames shed snow well, but the frame still has to be designed for it.
Size, lofts and extensions
Lofts, mezzanines, dormers and side extensions add engineering, steel and fit-out. Standard designs are quicker to price and engineer than custom ones.
Access and delivery
Steep, remote or narrow-access sites can need a smaller truck, extra handling or a crane, and that shows up in the delivery quote and the erection cost.
Finishes
Cladding, windows, kitchen and bathroom choices are the biggest variable you control. Price two finish levels before you commit.
A-Frame Kit vs Traditional Build: How to Compare Costs
A kit lets you buy the engineered structure at a known price and then choose who you pay for each trade. A builder’s fixed-price contract bundles all of that into one figure. To compare them fairly:
- Use the same floor area, including any loft or mezzanine.
- Use the same inclusions: footings, roofing, windows, fit-out and site costs.
- Count your own time and the builder’s margin if you manage trades as an owner builder.
- Check what each option includes for engineering and permits.
Read: Full A-Frame vs Traditional House Comparison →
How to Keep Your A-Frame Build Cost Down
1. Owner-builder approach
Managing the build yourself removes a builder’s margin, but you take on the responsibility. Each state has its own rules: in Victoria you need a certificate of consent from the Building and Plumbing Commission for domestic building work over $20,000; in NSW an owner-builder permit for work over $10,000; in Queensland a QBCC owner builder permit for work over $11,000. Our kits are designed for owner-builder projects.
Read: Owner Builder A-Frame Guide →
2. Choose a standard design
A published design is already drafted and priced. Custom dimensions need custom engineering.
3. Pick the right footing for your site
On sloping or reactive sites, piers or a steel subfloor can suit better than a full slab. Get a soil report first, then ask your engineer and concreter to price the options.
4. Stage your build
Get the home to lock-up first, then finish the interior as budget allows (your building permit sets the time limits).
5. Do the work you are allowed to do yourself
Painting, flooring and some fit-out can be owner work. Plumbing, gas and electrical must be done by licensed trades.
A-Frame Kit Home Cost FAQ
How much does an A-frame kit home cost in Australia?
Our published A-frame kits start from $35,000 for The Jamieson (25 m²) and go to $145,000 for The Dinner Plain (180 m², three bedrooms). Those are frame kit prices; the finished home costs more once you add footings, roofing, cladding, windows, services, fit-out and labour, which you price locally.
Is the kit price the total cost to build?
No. The kit is the structure only. Footings, lock-up materials, services, fit-out, labour, delivery and approvals are extra. Use the step table above to build the total from real quotes.
Do I need a building permit for an A-frame kit home?
Yes. An A-frame home is a Class 1a building under the National Construction Code, so it needs a building permit, and some sites need a planning permit too. We assist you with drafting, council planning and DA, and building permits.
Can I build an A-frame kit home as an owner builder?
Yes, if you meet your state’s owner-builder rules (for example a certificate of consent in Victoria or an owner-builder permit in NSW and Queensland). Licensed trades must still do plumbing, gas and electrical work.
Is delivery included in the kit price?
No. Delivery is quoted with your kit, based on your site’s location and access.
Does a bushfire rating change the cost?
It can. Sites with a higher bushfire attack level need materials and details that meet AS 3959 for that level, mostly in cladding, windows, decks and sealing. Find your BAL early, because it changes what you buy.
Get Your A-Frame Quote
Browse real floor plans with published prices, then ask us to quote the one you like for your site.
View All A-Frame Designs & Pricing →
Or call 1300 866 131 to discuss your project